Vergleichsreport

Vergleiche Einstellungen
Änderungen von:
bis:
Typ:

Veränderungen an Parts

Part "Inhalt" wurde verändert


Veränderungen des Inhalts
Klicken Sie für eine detaillierte Beschreibung auf die geänderten Stellen:
Benutzen sie die linke oder die rechte Maustaste, um zur jeweils vorherigen bzw. nachfolgenden Änderung zu gelangen.
 ersteletzte 
This is a Job PtmTaSynchronization

Purpose

The active, configurable job

that allows multiple configurations or requires at least one configuration.

This job enables the automatic entry of project times for full-day absences of employees, such as vacation or training, in order to ensure consistent project time recording.

Job Configuration

Days back to synchronize (excluding today) Selection of past days for which absences are to be transferred/synchronized to project time recording. Synchronize also attendance, not only creditable absence Select Yes/No: If "Yes" is selected, automatic project time booking is also permitted for attendances according to effort mappings (and any project time already can be overwritten). If "No" is selected, automatic project time booking is only carried out for absences according to effort mappings. Groups of persons the synchronization should be carried out Any group existing in the system can be selected for synchronization via the double-list.  Effort mappings The effort mappings define which project shall be automatically booked when a certain type of absence (or presence) is detected in the attendance booking. After adding a row via the "Add" button, the following fields have to be filled via choosers or dropdown-lists.

For absence reason

Choose the type of absence (or presence) in TA for which, when a booking is detected, project time shall be automatically booked.

Project

Choose the project to which the automatic project time booking shall be assigned.

Activity

Choose the activity which shall be booked within the project.

Customer

Choose the customer to which the automatic project time booking shall be assigned

Chargeable

Choose Yes/No: Shall the automatic project time booking be marked as chargeable?

Description

Here, you can add a free description that shall be added in the comment section of the automatically booked project times (e.g. "automatically booked due to attendance booking")

synchronizes daily TA absence times that count as working time, and optionally attendance times, into the PTM time tracking PtmTimeEffort.

Configuration

  • Days to synchronize into the past (daysBack): The period extends from today minus the configured number of days up to and including today. If the value is missing or negative, the code uses seven days.
  • Groups: If no groups are selected, the job processes all currently valid active persons. If groups are selected, only persons with a TA ID from the union of the selected groups are processed.
  • Also synchronize attendance (alsoSynchronizeAttendanceTime): In addition to mapped absences, the TA attendance is generated as a PTM time effort.
  • Mark as created by system (markAsCreatedBySystem): Marks the generated PTM time efforts as system-generated.
  • Effort mappings: For each TA absence reason or, optionally, the attendance code, the project, activity, customer, billability, and description are configured.

Behavior

  • Without a TA connector, or if the TA service is not available, the job logs a warning and ends the run.
  • Unmapped absence reasons are not written to PTM. Mapped absence reasons generate approved daily PTM time efforts with the configured mapping.
  • System-generated absence efforts are replaced or removed when changes occur. Manually recorded efforts are retained and, if applicable, reduce the attendance effort to be newly generated.
  • Synchronization takes place per person in a separate transaction. Persons without a TA ID are skipped if they were selected via groups.
  • An empty mapping list generates no entries and ends the job with a warning.

Notes

Before activating, check the absence reason/attendance mappings, the period, and the system flag. In the case of multiple TA employments, this job processes the TA reference of the respective Webdesk person according to the current TA service.

Mime Typetext/xmltext/xml
Datei-name
Größe (in Bytes)25422260
Version 2 von Mr. Ex-Mitarbeiter
am 21.06.19 08:55:17
Name: Job PtmTaSynchronization
Variante: main - en
Status: Veröffentlichung
Version 3 von Gabriel Gruber
am 17.10.26 18:11:36
Name: Job PtmTaSynchronization
Variante: main - en
Status: Veröffentlichung